The northbound side of Davies Station ramp. 83rd street and Argyll Road, Edmonton, Alberta.
45.5 metres long.
Mosaic on panels.
The southbound side of Davies Station ramp. 83rd street and Argyll Road, Edmonton, Alberta.
45.5 metres long.
Mosaic on panels.
A collaboration with Karen Klassen Commissioned by Edmonton Arts Council for Dermott Park.
Installation summer 2018; park opens 2019.
A collaboration with Karen Klassen Commissioned by Edmonton Arts Council for Dermott Park.
Installation summer 2018; park opens 2019.
Upcoming.
The 45.5-metre-long mosaic mural for the northbound side of the LRT ramp.
Upcoming.
The 45.5-metre-long mosaic mural for the southbound side of the LRT ramp.
244 cm x 114 cm (96" x 57")
Tinted mortar, smalti, dalle de verre, china, stained glass, recycled glass tiles, gold smalti.
Completed in 2014.
Commissioned by ATB (Alberta Treasury Branch) for its headquarters.
135 cm x 520 cm (53" x 205")
Italian and brazilian smalti, gold, ceramic tile, china, tinted mortar.
2017
A collaboration with Cátia Usevicius Maia and Christian Pérès Gibaut.
4.5 m x 9 m x 45 cm (14.7' x 29.5' x 1.5')
Mixed Media Mosaic with 3D buildings.
Completed in 2012.
Installed in the Edmonton International Airport.
6’ x 9’ oval.
Custom hand-cut limestone and marble floor in contemporary traditional design.
Completed in 2016.
Private Commission.
The northbound side of Davies Station ramp. 83rd street and Argyll Road, Edmonton, Alberta.
45.5 metres long.
Mosaic on panels.
The southbound side of Davies Station ramp. 83rd street and Argyll Road, Edmonton, Alberta.
45.5 metres long.
Mosaic on panels.
A collaboration with Karen Klassen Commissioned by Edmonton Arts Council for Dermott Park.
Installation summer 2018; park opens 2019.
A collaboration with Karen Klassen Commissioned by Edmonton Arts Council for Dermott Park.
Installation summer 2018; park opens 2019.
Upcoming.
The 45.5-metre-long mosaic mural for the northbound side of the LRT ramp.
Upcoming.
The 45.5-metre-long mosaic mural for the southbound side of the LRT ramp.
244 cm x 114 cm (96" x 57")
Tinted mortar, smalti, dalle de verre, china, stained glass, recycled glass tiles, gold smalti.
Completed in 2014.
Commissioned by ATB (Alberta Treasury Branch) for its headquarters.
135 cm x 520 cm (53" x 205")
Italian and brazilian smalti, gold, ceramic tile, china, tinted mortar.
2017
A collaboration with Cátia Usevicius Maia and Christian Pérès Gibaut.
4.5 m x 9 m x 45 cm (14.7' x 29.5' x 1.5')
Mixed Media Mosaic with 3D buildings.
Completed in 2012.
Installed in the Edmonton International Airport.
6’ x 9’ oval.
Custom hand-cut limestone and marble floor in contemporary traditional design.
Completed in 2016.
Private Commission.